Monday, June 22, 2026

Cape Clean Up

Alex, Christian & Leif as beach boys. This summer Alex visits Old Farm with his own beach boy, which is near 3 beaches.









The house number newly gold leafed installed and a new water line from house to the road will hook up with Roderick Construction Co.; the best. A new 117' 1" plastic water pipe will be shot underground and across the street!


New waterline path which remains undisturbed...


Bill's Cape planters cleaned up & ready for use.

 
I have bought 2 "new" Huskvarna mowers; a new electric 322 (below) 40 Volt, & a 1 yr. old 7.5, 4WD.
We maintain this 3/4 acre lot ourselves, originally 12 acres bought in 1630 from an Indian.



No comments:

Post a Comment