Saturday, December 4, 2021

Starting A Stone Wall



We are having a dry stack stone wall built between the rock garden and the back lawn where a large table is setup for summer entertaining occasionally. The stones came from under the dining room where we excavated to create a half basement and some were left here for this purpose I believe. The wall has been started in line with the back deck steps and will be 30' long X 22" high (sitting height). Five men got this far the first day by local stone workers. In front you can see the Road Mix (crushed stone) used as a tamped down level foundation after digging. Very large stones were used next. Below is the end of the day.











No comments:

Post a Comment