Five rooms upstairs in Christian's farmhouse have their plaster ceilings removed and recessed lights as well as fans in the bathrooms have been installed. This week Christian is finishing up the "Roxul" insulation which is two layers of 2" X 4" bats in two bedrooms with deep enough joists (single; 2" X 6" in the others). It is reassuring to know that this insulation is fireproof and mold resistant now!
Two of the larger bedrooms have LED recessed lights which are a terrific addition in such an old house.
No comments:
Post a Comment